The Ritz-Carlton Residences, Pompano Beach
One of 91 oceanfront buildings followed by The Pompano Beach, a local publication about a beach town changing shape, from Hillsboro Beach to Lauderdale-by-the-Sea. Confirmed figures are printed as figures and the rest are marked pending, with the reason.
Two towers on the south stretch of the corridor, one on the sand and one across the road on the Intracoastal, with the shared amenities split between them. The exterior was finished and the cranes came down in October 2025. Nothing above an agent site says when the first owner moves in.
From the developer's site, fortuneintlgroup.com: 22 or more renderings and interior images: towers, lobbies, pools, beach club, bars, lounges, waterfront exteriors.
No credit printed at the source. Retrieved Sep 14, 2026. Permission pending
The specifications
9 confirmed, 7 pending
- Address
- 1380 S Ocean Blvd, Pompano Beach, FL 33062 The developer's page, the trade press and the listing feed agree. The sales gallery is at 1201 S Ocean Blvd.
- Developer
- Fortune International Group and Oak Capital
- Brand
- The Ritz-Carlton, Marriott International Branded and serviced residences with no hotel. news.marriott.com holds no release for this project.
- Architect
- Revuelta Architecture International
- Interiors
- Lissoni & Partners The developer names the firm; the trade press names Piero Lissoni.
- Landscape
- Pending Florida YIMBY credits Piero Lissoni with the landscape as well as the interiors. No second source.
- Contractor
- Pending Florida YIMBY names Moss Construction as general contractor. No second source.
- Floors
- 32 The Beach Tower, on the ocean. The Marina Tower across the road is 14 storeys. Developer's page and Commercial Observer agree.
- Residences
- 205 117 in the Beach Tower and 88 in the Marina Tower, per the developer and Commercial Observer.
- Residence sizes
- 917 to 6,824 square feet Beach Tower 1,309 to 6,824, Marina Tower 917 to 3,947, per the developer.
- Site
- Pending The whole site, ocean to Intracoastal, is given as 4.5, 4.6, 4.7 and 5 acres by different sources. The 2.25 acres on the developer's page is the Beach Tower parcel alone.
- Frontage
- Pending 250 feet on the ocean and 250 on the Intracoastal, per Florida YIMBY alone.
- Delivery
- Pending The developer's own page still reads Completion Date 2025, a date that has passed. Its December 2023 press page said 2026, Florida YIMBY said sometime in 2026 in October 2025, and agent sites cite an unlocated June 2026 Real Deal item for September 2026.
- Construction
- Pending Florida YIMBY reported both tower cranes down and the exterior finished in October 2025, which is topped out. No second source, and no source reports closings or a certificate of occupancy as of 14 September 2026.
- Published prices
- Pending From $1 million at the December 2021 launch, per Florida YIMBY, with a 35 percent deposit.
- Amenities
- About 35,000 square feet of shared space split across the two towers: a beach club with cabanas and pools on the ocean side, and a marina with a yacht club, pools and a resident boat basin on the Intracoastal side, with the road between them. Also a gym, a spa, pickleball and paddle courts, private dining rooms and a children's room, with the Ritz-Carlton running the service. As the developer describes it.
What was here
Vacant land running from the ocean to the Intracoastal, bought by Lionheart Capital in 2013, approved for a taller two tower scheme in 2018, and sold to Fortune International in 2020 for $27.5 million.
- 2013 Lionheart Capital buys the site, $22.4 million Pending
Described then as among the last vacant oceanfront parcels in South Florida. What stood here before it was vacant was not found. From a search summary; the article answers 403.
The Real Deal , trade press - Apr 2018 City approves a 35 and 14 storey scheme Pending
Lionheart's earlier plan for the site, never built. From a search summary.
The Real Deal , trade press - Sep 30, 2020 Sold to Fortune International, $27.5 million Commercial Observer, The Real Deal , trade press
The record
- 2013Lionheart Capital buys the site, $22.4 million, not confirmed by a primary source
- 5 yearsApr 2018City approves a 35 and 14 storey scheme, not confirmed by a primary source
- 2 yearsSep 30, 2020Sold to Fortune International, $27.5 million
- 1 year, 2 monthsDec 16, 2021Sales launched, not confirmed by a primary source
- 11 monthsNov 2022Ground broken, not confirmed by a primary source
- 1 year, 1 monthDec 22, 2023$259 million construction loan, Bank OZK
- 1 year, 9 monthsOct 18, 2025Both tower cranes down, exterior finished, not confirmed by a primary source
- 1 year2026Under construction, a date that has not arrived
The latest
- Oct 18, 2025 Both tower cranes down, exterior finished Pending
Glass, handrails, stucco and a first coat of paint complete; completion then stated as sometime in 2026.
Florida YIMBY , trade press - Dec 22, 2023 $259 million construction loan, Bank OZK
Over 90 percent pre-sold at the loan closing.
Commercial Observer, and the developer's press page , trade press - Nov 2022 Ground broken Pending
Over 75 percent sold. Vertical construction was reported from May 2023, and the December 2023 loan coverage described construction as about to begin, so three sources mean three things by start.
Florida YIMBY , trade press - Dec 16, 2021 Sales launched Pending
Two towers, 205 residences, from $1 million, completion then stated as 2025.
Florida YIMBY , trade press
From the trade press, floridayimby.com: construction photographs of both towers, October 2025, plus amenity renderings.
Credit, as printed: Oscar Nunez (photographs); Ritz-Carlton Residences, Pompano Beach (amenity renderings). Retrieved Sep 14, 2026. Permission pending
Where this came from
- Two towers, 32 and 14 storeys, 117 and 88 residences, 1,309 to 6,824 and 917 to 3,947 square feet, Revuelta Architecture International, Lissoni & Partners, 2.25 acres and 250 feet of ocean frontage on the beach parcel, sales gallery at 1201 S Ocean Blvd, completion date printed as 2025https://fortuneintlgroup.com/property/the-ritz-carlton-residences-pompano-beach/Published page, press room or public record, checked Sep 14, 2026
- $259 million construction loan from Bank OZK, 205 condos across two buildings, over 90 percent pre-sold, construction started 2023, completion expected 2026https://fortuneintlgroup.com/edgardo-defortunas-fortune-ricardo-dunins-oak-capital-nab-259m-construction-loan-for-ritz-carlton-residences-pompano-beach/Published page, press room or public record, dated Dec 26, 2023, checked Sep 14, 2026
- Bank OZK lent $259 million; 32 storey tower with 117 units and 14 storey tower with 88; site bought from Lionheart in 2020 for $27.5 million; completion stated as 2025https://commercialobserver.com/2023/12/bank-ozk-the-ritz-carlton-residences-pompano-beach-the-ritz-carlton-residences-fortune-international-group/Published page, trade press, dated Dec 22, 2023, checked Sep 14, 2026
- Exterior glass, handrails, stucco and first coat of paint complete, both tower cranes dismantled, Revuelta and McNamara Salvia named, completion sometime in 2026https://floridayimby.com/2025/10/the-ritz-carlton-residences-pompano-beach-reaches-key-construction-milestones.htmlPublished page, trade press, dated Oct 18, 2025, checked Sep 14, 2026
- Groundbreaking at 1380 S Ocean Blvd, Moss Construction as general contractor, over 75 percent sold, Piero Lissoni for interiors and landscape, completion slated for 2025https://floridayimby.com/2022/11/construction-breaks-ground-at-1380-s-ocean-blvd-for-ritz-carlton-residences-pompano-beach.htmlPublished page, trade press, dated Nov 22, 2022, checked Sep 14, 2026
- Launch: 205 residences, from $1 million with a 35 percent deposit, 250 feet of ocean frontage on 2.25 acres and 250 feet on the Intracoastal, a private resident marinahttps://floridayimby.com/2021/12/fortune-international-group-and-oak-capital-announce-the-launch-of-the-ritz-carlton-residences-pompano-beach.htmlPublished page, trade press, dated Dec 16, 2021, checked Sep 14, 2026
- Fortune International Group paid Lionheart Capital $27.5 million for the 4.6 acre site; Lionheart paid $22.4 million in 2013 and won approval for a 35 storey and 14 storey scheme in April 2018. Search summaries only; the pages answer 403https://therealdeal.com/miami/2020/09/30/fortune-international-group-buys-waterfront-pompano-beach-site-for-28m/Published page, trade press, dated Sep 30, 2020, checked Sep 14, 2026
- 26.217959, -80.09138 for 1380 S Ocean Blvd, uncrosscheckedplaces.googleapis.com/v1/places:searchTextPublished page, checked Aug 20, 2026
Next along the shore