What's changing

What is going up

6 towers rising on the oceanfront and 2 just finished, in the order they deliver, with the ones whose date no developer has stated at the end. Each carries what was on the site before it, the dated record of how it got here, and every figure marked confirmed or pending against the source that gave it.

Completed 2023 Solemar Related Group What was hereVacant beach property when Related bought it in 2011 for about $6.2 million, held for nearly a decade through the recession, and launched only after Sabbia Beach nearby sold out. Marder Group holds a listing in this building. Completed 2025 Casamar Related Group What was hereBeach Villas Condominiums, a three storey building of 48 homes from 1979, on a lot zoned for 105 feet until the city raised the limit to 232 in 2021. Marder Group holds a listing in this building. Topped out Delivery 2027 Rosewood Residences Hillsboro Beach Related Group and Dezer Development What was hereLand once owned by homebuilder John Kennelly, bought out of bankruptcy by Dezer Development in 2016 for $28.5 million and by Related in 2020 for $30 million, vacant by 2024, and rezoned only after residents took the town to court over the height. Topped out Delivery 2027 Waldorf Astoria Residences Pompano Beach Related Group and Merrimac Ventures What was hereA vacant lot on the county record since at least 2010, bought by the Motwani family in 2011 together with the site across the road that became the Alliance apartments, and approved for 92 condominiums in 2015. Announced Delivery pending Armani/Casa Residences Pompano Beach SP Developments, Vertical Developments, WellDuo and GCF Development What was hereA 0.6 acre lot that a company led by Tomas Sinisterra bought in 2015 for $3.2 million, and which sat on the city's 2023 agenda under an earlier project name, Ocean Park. Announced Delivery pending Ocean 580 Under construction Delivery pending The Ritz-Carlton Residences, Pompano Beach Fortune International Group and Oak Capital What was hereVacant land running from the ocean to the Intracoastal, bought by Lionheart Capital in 2013, approved for a taller two tower scheme in 2018, and sold to Fortune International in 2020 for $27.5 million. Announced Delivery pending W Pompano Beach Hotel and Residences Related Group and BH Group What was hereA privately owned lot at the end of Atlantic Boulevard that the city has used for about 230 public parking spaces, where two earlier condominium schemes, WCI's OceanSide from 2005 and Chetrit Group's Oceanside Pompano Beach approved in 2016, were never built.

The shape of it

The new towers, among the ones that were already here

NORTHSOUTHRosewood Residences Hillsboro Beach · 10Armani/Casa Residences · 19Casamar · 21W Pompano Beach Hotel and Residences · 24Salato Residences · 10Waldorf Astoria Residences · 28Ritz-Carlton Residences · 32Aquazul · 24 Storeys. A dashed outline is a floor count the record has not confirmed; a ring is a building placed but with no floor count at all.
NORTHRosewood Residen…10Armani/Casa Resi…19Casamar21W Pompano Beach …24Salato Residences10Waldorf Astoria …28Ritz-Carlton Res…32Aquazul24SOUTHStoreys, in order along the beach. Dashed is unconfirmed.
Storey counts and coordinates from the building record in this repository. 5 of the towers going up are drawn, in the accent; the buildings already standing recede. A dashed outline is a floor count the record has not confirmed. 56 more buildings on the record have a coordinate and no floor count, and are not drawn. 27 buildings on the record have no coordinate and are not on the drawing at all.

76 of the 111 specifications across these 8 projects are confirmed by a press room, a public record or two trade reports that agree. The rest print as pending on the building's page, with every value a source gave and the reason it is not settled. 7 of the 8 carry what was on the site before, and none of those sites has been traced back further than the lot being vacant.

Nothing here comes from an agent site or a condo aggregator alone. Where the developer, the trade press and the county disagree, the page says so and picks nothing.